
Module Fabrication
P75 & P77 FPSO Offshore Oil and Gas Platforms
Client
QGI - PETROBRAS
Location
Rio de Janerio, Brazil
Total Tonnage
500 tons
Scope
As the scope of TEKFEN Tekfen Manufacturing Ceyhan Facility, structural steels of Flare Towers for P75 and P77 FPSO’s Platforms to be installed at Cessao Oneraso Region, Santos Basin in Rio de Janerio in Brazil, have been fabricated. In addition, fabrications of Flare Towers for P75 & P77 FPSO’s at Santos Basin have been performed. Flare Tower structures fabricated in Tekfen Manufacturing Ceyhan Facility have been transported to Iskenderun Port by means of special vehicles, and their assemblies have been performed over there at the port. Totally, 2 Flare Towers have been fabricated and handed over to customer within the scheduled time. Each of Flare Tower was 250 tons in weight and dimensions of the; W: 7,4 x L: 94 x H: 9,2 m.
