
Module Fabrication
P58 and P62 FPSO Offshore Oil and Gas Platform Project
Client
ABB - PETROBRAS
Location
Rio de Janerio, Brazil
Total Tonnage
1,000 tons
Scope
As the scope of TEKFEN Tekfen Manufacturing Ceyhan Facility, structural steels of E-House process modules for P58 and P62 FPSO Platforms to be installed at Parque das Baleias and Roncador Offshore Oil Fields in Brazil have been fabricated. Deck segments fabricated in Tekfen Manufacturing Ceyhan Facility, have been transported to Iskenderun Port by means of special vehicles, and their assembly have been performed over there at the port. Two E-House modules, of 1.000 tons in weight, have been fabricated and handed over to customer within the scheduled time. The Weight of the completed modules 470 and 530 tons, and dimensions of the modules were; W: 27,9 x L: 21,3 x H: 10,5 meter.
