background

Module Fabrication

P55 Submersible Offshore Oil and Gas Platform

Client

QUIP - PETROBRAS

Location

Rio de Janerio, Brazil

Total Tonnage

4,000 tons

Scope

As the scope of TEKFEN Tekfen Manufacturing Ceyhan Facility, The procurement and fabrication steel structure of topside deck box panels and other structures for P55 FPSO Platforms to be installed at Roncador field in the Campos Basin, offshore Brazil have been fabricated. In addition, fabrications of Topside Deck Box Panel modules for Submersible Platform Roncador field in the Campos Basin, offshore Brazil have been performed. Deck segments fabricated in Tekfen Manufacturing Ceyhan Facility, have been transported to Iskenderun Port by means of special vehicles, and their assembly have been performed over there at the port. Totally, 12 deck box panel modules and other structures, of 4,000 tons in weight, have been fabricated and handed over to customer within the scheduled time.

Image