
Pipe Spool Fabrication
BTC Ceyhan Marine Oil Export Terminal, Turkey
Client
BP – BOTAŞ (Petroleum Pipeline Corporation, Turkey)
Location
Adana, Turkey
Total Tonnage
2,000 tons
Scope
Fabrication of 1,000 t of pipe spools for the Tank Farm (7 x 150,000 m3) and 2.7 km long Jetty constituting the main parts of Ceyhan Marine Export Terminal where the historical 1,740 km long Baku-Tbilisi-Ceyhan Crude Oil Pipeline reaches the open seas through the Mediterranean.
