background

HSE & Quality Policy

The Plant has led the implementation of the International standards:

  • - ISO 9001:2008 - Quality Management System,
  • - OHSAS 18001:2007 - Occupational Health and Safety Management System,
  • - ISO 14001:2004 - Environmental Management System,
  • - ISO/IEC 27001:2013 - Information Security Management┬áSystems,
  • - EN 1090 EXC 4 - Conformity of the Factory Production Control
  • - EN ISO 3834-2 - Welding of Steel Construction, Pipe Lines, Pressure Vessels and Steel Construction of Off-Shore Platform.
HSE Performance 2017 2016 2015 2014
LTI-Total number of incidents with lost time 0 0 0 0
TI-Total number of incidents with or without lost time including medical treatment 5 6 10 15
PD-Property damage 0 0 0 0
Total man-hours (x103) 1.500 1.500 2.000 2.600
PDF Click here for "Health, Safety, Environment & Quality Policy" document.

Our HSE Goals are:

Image
No Harm to People
Image
No Harm to Environment
Image
No Accidents

Ceyhan's QA/QC Capabilities

  • - 8 Engineers and 24 Technicians
  • - ORACLE based in all Quality Documentation and Traceability
  • - In-house Level I, II, III NDT personnel (ASNT, SNT-TC-1A, EN 473/ISO 9712, PED 2014/68/EU)
  • - Certified Coating Inspectors (NACE Level II, SSPC Level II)
  • - Certified Welding Inspectors ( TWI CSWIP 3.0 and 3.1, IIW)
  • - Certified Welding Engineers
  • - Positive Material Identification (PMI)
  • - X-Ray and Gama Ray Radiographic Testing
  • - Manual and Automated (TOFD, PAUT) Ultrasonic Testing
  • - Surface Inspection (MT, PT)
  • - Hardness Testing with Ultrasonic Testing Equipment and Eddy Current System
  • - Ferrite Testing
  • - Hydrostatic Testing
  • - Pneumatic Testing
  • - Visual and Dimensional Inspection
  • - Optical, 3D Inspection Devices, Portable CMM with Total Station
  • - Material Traceability Using Oracle ERP-Barcoding System
Image
Image